Once the metal is cleaned, treated, and painted, the strip is rewound into a coil size prescribed by the customer. From there, the coil is removed from the line and packaged for shipment or additional processing.
After the primer is applied and cured, then the metal strip enters the finish coat station where a topcoat is applied. Topcoats provide color, corrosion resistance, durability, flexibility and any other required physical properties. Like primers, the topcoat is cured using thermal cure ovens.
Oven
Coil coating ovens can range from 130 feet to 160 feet and will cure the coatings in 13 to 20 seconds.
During this stage, the strip enters the prime coat station whereby a primer is applied to the clean and treated metal. After the primer is applied, the metal strip travels through a thermal oven for curing. Primers are used to aid in paint adhesion, improve corrosion performance and enhance aesthetic and functional attributes of the topcoat.
S Wrap Coater
The S wrap coater design allows for primers and paints to be applied to the top and back side of the metal strip simultaneously in one continuous pass.
The cleaning and pretreating section of the coil coating process focuses on preparing the metal for painting. During the cleaning stage, dirt, debris, and oils are removed from the metal strip. From there, the metal enters the pretreatment section and/or a chemical coater whereby chemicals are applied to facilitate paint adhesion and enhance corrosion resistance.
Dried-In-Place
In this stage a chemical that provides enhanced corrosion performance is applied. This treatment can be chrome free if required.
The accumulator is a structure that adjusts up and down to store material, which makes continuous operation of the coil coating process possible. This accumulation will continue to feed the coil coating processes while the entry end has stopped for the stitching process. As much as 750 feet of metal can be collected.
Design Considerations for Hot-dip Galvanizing: Cold Worked Steels
Any form of cold-working reduces steel's ductility. Operations such as punching holes, notching, producing fillets of small radii, shearing, or sharp bending may lead to strain-age embrittlement of susceptible steels.
Many structures and parts are fabricated using cold-working techniques (bending, hole-punching, rolling, shearing). Severe cold-working increases the incidence of strain-age embrittlement. The effects of strain-age embrittlement may be accelerated by the galvanizing process, because aging is relatively slow at ambient temperatures but more rapid at the elevated temperatures encountered in the galvanizing process. (See also Bend Diameters).
Any form of cold-working reduces steel’s ductility. Operations such as punching holes, notching, producing fillets of small radii, shearing, or sharp bending may lead to strain-age embrittlement of susceptible steels. Cold-worked steels less than 1/8″ (3 mm) thick subsequently galvanized are unlikely to experience strain-age embrittlement. Since cold-working is the strongest contributing factor to the embrittlement of galvanized steel, these tips are recommended to reduce the incidence of strain-age embrittlement:
Select steels with carbon contents below 0.25%.
Choose steels with low transition temperatures since cold-working raises the ductile-brittle transition temperature and galvanizing (heating) may raise it further.
Specify aluminum-killed steels; they show less susceptibility to strain-age embrittlement.
For steels with a carbon content between 0.1% and 0.25%, maintain a bending radius of at least three times (3x) the section thickness. If bending is required to be less than 3x, the material should be stress-relieved at 1100 F (595 C) for one hour per inch (2.5 cm) of section thickness.
Avoid notches – they increase stress. Notches may be caused during shearing or punching operations. Flame-cutting or sawing is preferred, particularly for heavy sections.
Drill, rather than punch, holes in material thicker than 3/4″ (19 mm). If holes are punched, they should be punched undersize and then reamed an additional 1/8″ (3 mm) overall or drilled to size. Material between 1/4″ and 3/4″ (6.5 – 19 mm) thick is not seriously affected by cold punching if the punching is done under good shop practice. Material up to 1/4″ (6.5 mm) thick that has been cold-worked by punching does not need stress-relieving before galvanizing.
For steel sections with edges greater than 5/8″ (16 mm) thick subject to tensile loads, cut using normal shop procedures. Edges of sections up to 5/8″ (16 mm) thick may be cut by shearing.
In critical applications, the steel should be hot-worked above 1200 F (650 C) in accordance with the steel manufacturer’s recommendations. Where cold-working cannot be avoided, stress-relieve the part.
Where cold-working cannot be avoided, stress-relieve the part at 1100 F (593 C) for one hour per inch (2.5 cm) of material thickness. ASTM A143, Safeguarding Against Embrittlement of Hot-Dip Galvanized Structural Steel Products and Procedure for Detecting Embrittlement, and CSA Specification G164, Hot-Dip Galvanizing of Irregularly Shaped Articles, provide guidance on cold-working and stress-relieving procedures. However, it is best to avoid severe cold-working of susceptible steels. If there is concern with possible loss of ductility due to strainage embrittlement, advise your galvanizer. A sample quantity of the cold-formed items should be galvanized and tested before further commitment.
Cold-working also must be taken into consideration with respect to another potential mechanical change that may occur during galvanizing’s chemical cleaning process: hydrogen embrittlement. During the chemical reaction between steel, rust, and the chemicals used in the pickling stages of the galvanizing process, hydrogen is produced, which is then absorbed by the steel. Upon immersion into the molten zinc, the hydrogen is expelled as gas. If the steel has been severely cold-worked in a very small region, the hydrogen can be trapped in the steel, causing hydrogen embrittlement when the part is put under stress during use.
Hydrogen embrittlement is of concern only when the ultimate localized tensile strength of the cold-worked steel exceeds 170 ksi (1,200 MPa). Mechanically cleaning of localized high-strength steel areas avoids hydrogen embrittlement.
Design considerations courtesy of American Galvanizers Association. The AGA also has the publication, The Design of Products to be Hot-Dip Galvanized After Fabrication, available for download.
Each year, the American Galvanizers Association honors projects that showcase the versatility and long-term value of hot-dip galvanizing. Spanning a wide number of industries, the Excellence Awards highlight how galvanizing contributes to durable, low-maintenance solutions that stand the test of time.
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”, you consent to the use of ALL the cookies. If essential cookies are disabled, the website may not function properly.
This website uses cookies to improve your experience while you navigate through the website. Out of these, the cookies that are categorized as necessary are stored on your browser as they are essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may affect your browsing experience.
Necessary cookies are absolutely essential for the website to function properly. These cookies ensure basic functionalities and security features of the website, anonymously.
Cookie
Duration
Description
cookielawinfo-checkbox-analytics
11 months
This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics".
cookielawinfo-checkbox-functional
11 months
The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional".
cookielawinfo-checkbox-necessary
11 months
This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary".
cookielawinfo-checkbox-others
11 months
This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other.
cookielawinfo-checkbox-performance
11 months
This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance".
viewed_cookie_policy
11 months
The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data.
Functional cookies help to perform certain functionalities like sharing the content of the website on social media platforms, collect feedbacks, and other third-party features.
Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics the number of visitors, bounce rate, traffic source, etc.
Advertisement cookies are used to provide visitors with relevant ads and marketing campaigns. These cookies track visitors across websites and collect information to provide customized ads.